Culvert diversion and open channel drainage
- Priory
- Jan 30, 2021
- 1 min read
A recent culvert diversion carried out by Priory for a client, just awaiting some tidy weather to finish and landscape.
A big thanks to Mike Hackwood at HACKWOOD FABRICATED SOLUTIONS LTD for assisting to design and then fabricate the drainage with in-built steps/checkwalls to reduce velocity in storm conditions. All material was prefabricated off site, reducing man hours spent on site in a difficult location. Fantastic turnaround and product, we can't recommend them highly enough.

If Priory can assist with any if you civil or structural Engineering or project requirements, please get in touch through our contact form.
Comments